STV Phobos (TOV-0026): Difference between revisions

From Solas Tempus DB
No edit summary
No edit summary
Line 12: Line 12:
|auxname=Violet Orchid
|auxname=Violet Orchid
}}
}}
The Phobos was constructed at the [[Umbral Shipyards]] in the [[Schatten Star System]], construction for this ship completed on December 26th, 2385 and in 2386 the vessel was assigned to Commander [[Crystal Favor]].
The Phobos was constructed at the [[Umbral Shipyards]] in the [[Schatten Star System]], construction for this ship completed on December 26th, 2385. In April 2386 the vessel was assigned to Commander [[Crystal Favor]].


When Crystal Favor was assigned the vessel it underwent some minor refitsThe ship is now equipped with ''9 extendable plasma turrets located along the saucer'', 5 dorsal and 4 ventral located at cardinal positions forward, aft, port, and starboard.  On the dorsal section, the turrets are arranged on either side of the pylon for the weapons pod.  In addition the deflector shield grid along the entire vessel has been upgraded to allow it to operate as an ''active point defense system''Additional high output power distribution conduits and other support systems provide direct power output from the ships primary and secondary grids for the new armaments.
== Initial Construction ==
Initially constructed December 26th, 2385Designed for reconnaissance and defensive deployment, she was constructed with additional armaments.
* 10 Plasma Pulse Turrets
: Fitted to the saucer, 5 dorsal and 5 ventral.  They retract into the hull and are shielded from scans until deployed.  They are situated forward, port, starboard, and 2 directed aft situated on either side of the hull and on the ventral side and the weapons pod support pylon on the dorsal side.
* Experimental Deflector Point Defense System
: The primary shield grid is outfitted with additional power to the beam deflectors used while at warp.  In addition to providing a static deflector shield, the beam system has been modified with an experimental point defense system.
 
== Testing Service ==
From December 2385 to April of 2386 the vessel served limited deployment in actual service while the experimental systems were tested.  In April of 2386 she was cleared to go on active duty pending her first refit.
 
== First Refit ==
In April of 2386 the vessel underwent additional refitting prior to Crystal Favor taking command.  The experimental point defense system was updated with a more reliable version and the shielded plasma turrets were updated with additional high powered transfer tapsThe new design allows the turrets to draw power directly from the M/AM reactor and impulse fusion reactors.


[[Category:Space Vessels]]
[[Category:Space Vessels]]

Revision as of 01:46, 19 April 2021

Phobos
STV Phobos (TOV-0026)
Information
Class: Nebula Class Starship
Affiliation: Solas Tempus
Commanding Officer: Commander Crystal Favor
MSAI: Commander Crystal Favor
Quote: "Learn as if you were going to live forever. Live as if you were going to die tomorrow." - Mahatma Gandhi
Captain's Gig: Violet Orchid
Status: Active

The Phobos was constructed at the Umbral Shipyards in the Schatten Star System, construction for this ship completed on December 26th, 2385. In April 2386 the vessel was assigned to Commander Crystal Favor.

Initial Construction

Initially constructed December 26th, 2385. Designed for reconnaissance and defensive deployment, she was constructed with additional armaments.

  • 10 Plasma Pulse Turrets
Fitted to the saucer, 5 dorsal and 5 ventral. They retract into the hull and are shielded from scans until deployed. They are situated forward, port, starboard, and 2 directed aft situated on either side of the hull and on the ventral side and the weapons pod support pylon on the dorsal side.
  • Experimental Deflector Point Defense System
The primary shield grid is outfitted with additional power to the beam deflectors used while at warp. In addition to providing a static deflector shield, the beam system has been modified with an experimental point defense system.

Testing Service

From December 2385 to April of 2386 the vessel served limited deployment in actual service while the experimental systems were tested. In April of 2386 she was cleared to go on active duty pending her first refit.

First Refit

In April of 2386 the vessel underwent additional refitting prior to Crystal Favor taking command. The experimental point defense system was updated with a more reliable version and the shielded plasma turrets were updated with additional high powered transfer taps. The new design allows the turrets to draw power directly from the M/AM reactor and impulse fusion reactors.