STV Pedlar Saint (SOV-0016): Difference between revisions

From Solas Tempus DB
No edit summary
No edit summary
 
Line 6: Line 6:
|image=Daedalus-exterior.png
|image=Daedalus-exterior.png
|status=Unassigned
|status=Unassigned
|quote="Technology frightens me to death. It's designed by engineers to impress other engineers, and they always come with instruction booklets that are written by engineers for other engineers which is why almost no technology ever works." - John Cleese
}}
}}
The Pedlar Saint is an engineering service and repair vessel currently awaiting assignment at the [[Umbral Shipyards]].  Construction was completed on May 3rd, 2385, her construction was designed to accommodate the newer [[Refit Guidelines#Daedalus Class|Refit Guidelines]] for that class of ship as a science vessel.  As a service vessel focusing on engineering tasks such as repair and refit, she is equipped with industrial replicators and enhanced tractor beams and her phasers are designed with a lower power output but a 227% increased fine beam control and targeting array.
The Pedlar Saint is an engineering service and repair vessel currently awaiting assignment at the [[Umbral Shipyards]].  Construction was completed on May 3rd, 2385, her construction was designed to accommodate the newer [[Refit Guidelines#Daedalus Class|Refit Guidelines]] for that class of ship as a science vessel.  As a service vessel focusing on engineering tasks such as repair and refit, she is equipped with industrial replicators and enhanced tractor beams and her phasers are designed with a lower power output but a 227% increased fine beam control and targeting array.

Latest revision as of 22:51, 5 May 2019

Pedlar Saint
STV Pedlar Saint (SOV-0016)
Information
Class: Daedalus Class Starship
Affiliation: Solas Tempus
Quote: "Technology frightens me to death. It's designed by engineers to impress other engineers, and they always come with instruction booklets that are written by engineers for other engineers which is why almost no technology ever works." - John Cleese
Status: Unassigned

The Pedlar Saint is an engineering service and repair vessel currently awaiting assignment at the Umbral Shipyards. Construction was completed on May 3rd, 2385, her construction was designed to accommodate the newer Refit Guidelines for that class of ship as a science vessel. As a service vessel focusing on engineering tasks such as repair and refit, she is equipped with industrial replicators and enhanced tractor beams and her phasers are designed with a lower power output but a 227% increased fine beam control and targeting array.